Skip to content

01Free UK Online Calculator & Excel

Bill of Materials (BOM) Template UK: Free Excel Cost Roll-Up & Calculator

Free Bill of Materials (BOM) calculator and unlocked Excel template (.xlsx) for UK manufacturers: component quantities, scrap allowance, labour and unit cost.

IncludesLive browser BOM cost calculator + Excel (.xlsx)
Cost layersRaw materials, sub-assemblies, scrap %, labour
Use casesDiscrete manufacturing, assembly & job shops
Next stepConnect BOMs directly to stock & work orders in ERP
Interactive Manufacturing Costing Tool · Multi-Level BOM Roll-Up

Bill of Materials (BOM) Cost & Scrap Roll-Up Calculator

LvlPart #ComponentQtyScrap %Unit CostExtended
$166.65
$56.13
$37.13
$82.82
Rolled-Up Material (incl. Scrap)$342.73Direct routing labor: $39.00
Standard Unit Cost$381.73Material + assembly roll-up
Batch Run Total (50 pcs)$19,086.65Total WIP valuation

What Belongs in a Manufacturing Bill of Materials (BOM)

A Bill of Materials (BOM) is the structured recipe for building a finished product — listing every raw material, component, sub-assembly, unit of measure, quantity per unit and expected scrap percentage. Accurate BOMs prevent mid-run stockouts and reveal true unit margins before quoting.

  • Single-level vs. multi-level BOM: Flat lists suit simple kits; multi-level BOMs nest sub-assemblies so an engineering revision updates every parent product.
  • Scrap & yield factor: Adding realistic scrap percentages (e.g. 3–5% for cutting or setup waste) keeps purchasing quantities accurate.
  • Live ERP connection: When spreadsheets fall out of sync with warehouse stock, Draivix Bills of Materials & Recipes automatically checks component availability and generates purchase requests from confirmed sales orders.

02Frequently Asked Questions

What is the difference between an Engineering BOM (EBOM) and a Manufacturing BOM (MBOM)?

An EBOM reflects how a product is designed (CAD structure), whereas an MBOM reflects how it is actually purchased, kitted and assembled on the shop floor — including packaging and consumables.

How does a BOM connect to MRP and stock control?

When a production order is created, the system multiplies the BOM quantities by the batch size, checks available warehouse stock and flags any component shortages for purchasing.

Let’s start together

Tell us how your business works.

We will show you what a system that takes over part of that work could look like.

Book a consultation